V CUBE CONSTRUCTIONS
  • Home Page
  • Projects
    • Current Projects >
      • Pranavi Elite >
        • Project Details
        • Floor Plan
        • Work Photos
        • Highlights
        • Specifications
        • Route Map
    • Completed Projects >
      • Varsha Elite >
        • Project Details
        • Floor Plan
        • Work Photos
        • Highlights
        • Specifications
        • Route Map
      • Aasritha Paradise >
        • Project Details
        • Work Photos
        • Floor Plan
      • Sunrise Towers >
        • Project Details
        • Work Photos
        • Floor Plan
      • Krishna Teja Home
      • Kanakadurga Nilayam
      • House at Kanuru
  • Knowledge Hub
    • Construction Practices >
      • Project Management
      • Rod Bending Practices
    • New Home Buyer Guide >
      • Advance Booking A Flat - Good or Bad
      • Analysis of Construction Materials
      • Analysis of Construction Practices
      • Analysis of Construction Specifications
    • General Information >
      • Bank Home Loan Guide
      • Taxes while purchasing flat
      • Home Loan - Daily Rest Method
  • Gallery
    • Project Photos >
      • Varsha Elite Gallery
      • Aasritha Paradise Gallery
      • Sunrise Towers Gallery
      • Kanuru House Gallery
    • Work Photos
    • Misc Photos >
      • CREDAI SouthCon'24
      • CREDAI Vijayawada MC2023-25 Installation
      • CREDAI NATCON Dubai 2022
      • CREDAI Property Show 2022
      • CREDAI Property Show 2018
  • About Us
  • Contact Us

Series-III: Analysis of Construction Specifications

Purpose of the article: Construction Specifications of all apartments look similar and same. Though we can not conclude construction quality based on specifications, better or standard specifications can be separated out with little examination and scrutinizing. Some of the tweaks used by builders are -
         a. Not to mention material brand names in specifications, as they can go for low-grade and low-cost material during construction phase.
              b. Usage of regular phrases - like quality material or ISI standard. Nowadays, most of the local brands are also having ISI marking. Please note that there will be many ISI specifications in one category.

III. CONSTRUCTION SPECIFICATIONS

Specification Standard Below Par / Regular Wording
FOUNDATION
SUPER STRUCTURE
WALLS
PLASTERING
- These specifications look same and standard wording
- No one express or differentiate their work/standard here
PLUMBING & SANITARY - Concealed Astral/Ashirwad CPVC plumbing lines with Jaguar/Hindware/Cera make CP fittings
- Parryware/equivalent make sanitary fittings
- SWR drainage pipes of Astral/Ashirwad/Sudhakar make
- ISI mark GI piping lid/CPVC piping of adequate size.
- Superior quality PVC for sanitary piping, drain piping and venting system of adequate sizing.
- All bathrooms consist of best quality polished chrome (CP) fittings
ELECTRICAL - Concealed copper wiring with Finolex/Anchor/ equivalent make
- Modular switches of Legrand/GM/equivalent make
- Concealed copper wiring in PVC conduits with modular switches. Adequate fan points, TV. & telephone points
- Quality copper wiring with necessary electrical points
PAINTS (internal) - Wall care finish with plastic emulsion paint - Internal walls and ceiling with smooth Altek finish with emulsion paint (Asian Paints).
- Internal walls and ceiling with plastic emulsion paint.
- Smooth luppam finishing
Proudly powered by Weebly