V CUBE CONSTRUCTIONS
  • Home Page
  • Projects
    • Current Projects >
      • Pranavi Elite >
        • Project Details
        • Floor Plan
        • Work Photos
        • Highlights
        • Specifications
        • Route Map
    • Completed Projects >
      • Varsha Elite >
        • Project Details
        • Floor Plan
        • Work Photos
        • Highlights
        • Specifications
        • Route Map
      • Aasritha Paradise >
        • Project Details
        • Work Photos
        • Floor Plan
      • Sunrise Towers >
        • Project Details
        • Work Photos
        • Floor Plan
      • Krishna Teja Home
      • Kanakadurga Nilayam
      • House at Kanuru
  • Knowledge Hub
    • Construction Practices >
      • Project Management
      • Rod Bending Practices
    • New Home Buyer Guide >
      • Advance Booking A Flat - Good or Bad
      • Analysis of Construction Materials
      • Analysis of Construction Practices
      • Analysis of Construction Specifications
    • General Information >
      • Bank Home Loan Guide
      • Taxes while purchasing flat
      • Home Loan - Daily Rest Method
  • Gallery
    • Project Photos >
      • Varsha Elite Gallery
      • Aasritha Paradise Gallery
      • Sunrise Towers Gallery
      • Kanuru House Gallery
    • Work Photos
    • Misc Photos >
      • CREDAI SouthCon'24
      • CREDAI Vijayawada MC2023-25 Installation
      • CREDAI NATCON Dubai 2022
      • CREDAI Property Show 2022
      • CREDAI Property Show 2018
  • About Us
  • Contact Us

Independent House @
Tulasi Nagar, Kanuru,
Vijayawada.


Project start date:  10-Feb-2015
Completion date: Sep-2015 (8 months)

PROJECT DETAILS :
The proposed G+1 independent house is being built on contract basis at Tulasi Nagar, Kanuru. It is an east-facing plot measuring around 135 sq.yds. Land owner (Retd. Bank Manager) lives in Tirupati and used to visit the constriction site once in a month.
Total built-up area for two floors : 2,200 sq.ft.

To see the work photos, Click Here

SALIENT FEATURES :
  • Construction of house as per specifications agreed, with utmost importance to quality material and workmanship
  • Regular updation to land owner about status of project and making sure construction is as per his satisfaction
  • Plan approval: Provided assistance in applying and getting plan approval from respective local civic body (either CRDA/Corporation/Panchayat)
  • Home-loan approval: Provided assistance in applying and getting faster home-loan approval from banks
Woodwork - Sunglass on plywood
Hall
Modular Kitchen
Successful Execution of Proejct - as per Owner's satisfaction
4-khana window and elevation tiles on front side
Marbles for Steps - on Owner's Request
Almost done - Final Touches going on
Super Structure of the House - completed brick work
Continuous monitoring of work - at every stage
Sand Filter Usage - mandatory for plastering and brickwork
Applying CM mortar on pillars and base - before starting brickwork
Applying Anti-Termite Chemicals for Wood Items
Watchman - exclusively for watering purpose
SLAB concrete day - FULL BUSY
Two mestries for each pillar
Anti-termite water for bed concrete
Agars and concrete filling
Bhoomi Pooja
Proudly powered by Weebly